Appendix 1 – Citation Summary

Ref No. Reference
1 Rocky Flats Strategic Plan, Department of Energy Rocky Flats Field Office, September 1994
2 Making Contracting Work Better and Cost Less, February 1994
Report of the Contract Reform Team
2a – The Report
2b – The Appendices
3 FINAL Rocky Flats Cleanup Agreement, July 1996
4 Estimating the Cold War Mortgage, The 1995 Baseline Environmental Management Report (BEMR), March 1995
5 Rocky Flats Future Site Use Working Group Recommendations for Rocky Flats Environmental Technology Site, June 1995
6 Comment Response Document, Rocky Flats Sitewide Environmental Impact Statement, 1994
7 Interim End State Plan Task Descriptions, September 1995
8 Rocky Flats Environmental Technology Site Draft ACCELERATED SITE ACTION PROJECT, October 1995
8a – The Report
8b – The Appendices
9 Phase II - Choices for Rocky Flats, Accelerated Site Action Project, Draft Revision 1, February 1996
9a – Part 1 Introduction
9b – Part 2 Presentation of Alternatives
9c – Part 3 Alternative Comparative Analysis
9d – Part 4 Path Forward
9e – Part 5 Appendices
10 Barbara A. Mazurowski ltr. (01-00021) to Robert G. Card, Safety Concerns, January 5, 2001
12 Contract No. DE-AC34-95RF00925, Modification M014, Signed December 13, 1995
13 Contract No. DE-AC34-95RF00925, Modification M135, Signed November 1999
14 1996 Baseline Environmental Management Report, June 1996
15 Accelerating Cleanup: Focus on 2006 (“Ten Year Plan”), June 1997
16 10 Year Plan, Rocky Flats Environmental Technology Site, Draft Version 1.0, July 1996
17 Rocky Flats Closure Project Management Plan, June 1998
18 Rocky Flats Interagency Agreement, January 1991
The State of Colorado, The USEPA, and the USDOE
18a – The Report
18b – The Appendices
19 UNITED STATES ENVIRONMENTAL-PROTECTION AGENCY REGION VIII, COLORADO DEPARTMENT OF HEALTH, (RC3A VIII-86-06 - CERCLA VIII-86-06), IN THE MATTER OF: Department of Energy Rocky Flats Plant, Golden, Colorado COMPLIANCE AGREEMENT (RF-0169), July 1986
20 Albuquerque Operations Office Environment, Safety, and Health Division Environmental Programs Branch, Comprehensive Environmental Assessment and Response Program, Phase 1: Installation Assessment Rocky Flats Plant, April 1986
21 Settlement Agreement and State Compliance Order on Consent No. 94-07-07-01 EPA Docket #: CERCLA-VIII-91-03 & RCRA-VIII-91-07, August 1994
22 Rocky Flats Environmental Technology Site, DRAFT FINAL Soil Action Levels Technical Memorandum (Waiver No. CEX-105-01), June 2003
23 FY2005 FINAL Historical Release Report, June 2006
24 Environmental Restoration RFCA Standard Operating Protocol (ER RSOP) for Routine Soil Remediation, Modification 1, September 2003

024a – The Report thru Section 13
Introduction, Regulatory And Stakeholder Interfaces, Site Description, Interfaces, Accelerated Action Decisions, Project Approach, Environmental Protection And Monitoring, Worker Health And Safety, Work Controls, Waste Management, Quality Assurance, Decision Management

024b – The Report Section 14 and Appendices
Environmental Consequences, Records Disposition, References

25 RSOP for Soil and Asphalt Management, August 2001
26 Decommissioning Program Plan, October 1998
27 Decontamination and Decommissioning (D&D) Characterization Protocol, Revision 3, April 2001
28 Building 771/774 Cluster Closure Project Reconnaissance Level Characterization Report, Revision 2, AUGUST 1998
29 Rocky Flats Environmental Technology Site PRE-DEMOLITION SURVEY -REPORT (PDSR), Building 771, Area AF, REVISION 0, September 2004
30 RFCA Standard Operating Protocol (RSOP) for Recycling Concrete, September 1999
31 RFCA Standard Operating Protocol for Facility Disposition, August 2000
32 RFCA Standard Operating Protocol for Facility Component Removal, Size Reduction, and Decontamination Activities, February 2001
33 Contract No. DE-AC34-00RF01904, US Department of Energy ROCKY FLATS FIELD OFFICE and KAISER-HILL COMPANY, LLC, February 2000
34 RFCA Attachment 8, Regulatory Milestones, July 1996
35 Rocky Flats National Wildlife Refuge Final Comprehensive Conservation Plan and Environmental Impact Statement (DPP/EIS), September 2004
36 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 27 Interaction of EPA, State and Stakeholders on Regulatory Agreement
37 Contract No. DE-AC34-95RF00925, US Department of Energy ROCKY FLATS FIELD OFFICE and KAISER-HILL COMPANY, LLC, April 1995
38 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL AUDIT OF THE CONTRACTOR INCENTIVE PROGRAMS AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE (DOE/IG-0411), August 1997
39 Rocky Flats Environmental Technology Site Closure Project Baseline, Revision 5, June 2000
40 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 02 Contract type CPIF easier to Manage
41 EV/SV MASTER MATRIX
42 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 05 Improvements to contract
43 Kaiser-Hill 1st Qtr FY 2004 Government Furnished Services and Items (GFS/I) Request, no date provided
44 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 04 Improvements to contract
45 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 14 Contract Language
46 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 03 Improvements to contract fee payment process
47 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 01 Contract Language
48 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 06 Improvements to contract related to fee schedules-recommendation for fixed quarterly payments
49 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 25 Federal Worker Mindset
51 DEPARTMENT OF ENERGY Accelerated Closure of Rocky Flats: Status and Obstacles, April 1999, GAO/RCED-99-100
52 NUCLEAR CLEANUP Progress Made at Rocky Flats, but Closure by 2006 Is Unlikely and Costs May Increase, February 2001, GAO-01-284
53 Rocky Flats Environmental Technology Site Closure Project Baseline, Revision 3, 1999
54 Project Control System Description, March 2000
55 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 11 Cost savings and improved performance by consolidating Procurement systems
56 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 12 Waste Generation rates are Poor Project metric
57 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 07 Broader Interpretation of Risk Management Needed
58 Building 771/774 Basis For Operations, December 1999
60 Decommissioning Closeout Report for the 779 Cluster Interim Measure/Interim Remedial Action, February 1998
61 Rocky Flats Environmental Technology Site Building 707/707A Decommissioning Basis for Interim Operation (DBIO), Revision 4, February 2002
61a – DOE Approval Report
61b – Executive Summary and Intro
61c – Chapter 2
61d – Chapter 3
61e – Chapter 4
61f – Chapter 5
61g – Chapter 6
61h – Chapter 7
61i – The Appendices
62 Rocky Flats Environmental Technology Site Safety Analysis Report, February 2001
62a – Chapters 1 & 2 (Introduction and Site Description and Characteristics)
62b – Chapter 3 (Site Configuration, Support Systems and Uti1ities)
62c – Chapters 4 & 5 (Site Hazard Analysis and Natural Phenomena and External Events)
62d – Chapter 6 (Safety Management Programs)
62e – Chapters 7 & 8 (Site Controls and Transportation Safety Analysis)
62f – Appendices A - G (Acronyms, Glossary, Facilities Listing, Fuel Gas Systems, Steam And Condensate System, Domestic Water System, Building 666 Safety Analysis)
62g – Appendices H - I (B881 Safety Analysis And RCRA Safety Analysis)
62h – Appendix J (Outdoor Waste Management
62i – SAR Approval
62j – Page Change Approvals
62k – More Page Change Approvals
63 Site Safety Improvement Plan, Revision 6, April 16, 2001
64 EM-RFO--EGGR-771OPS-1994-0062, A Pu-containing liquid was drained from a process line. Line draining was not within the scope of procedure being used, August 1995
65 EM-RFO--KHLL-779OPS-1999-0006, D&D Worker in Building 779 Received Finger Laceration While Working in Glovebox 955 in Room 133, September 1999
66 EM-RFO--KHLL-NONPUOPS1-2002-0002, Beryllium Sample Results Above Action Level, September 2002
67 EM-RFO--KHLL-771OPS-2000-0057, Bioassay Results On Eleven Workers Above Decision Level, October 2001
68 EM-RFO--KHLL-371OPS-2003-0011, During D&D Operations Combustibles In Glovebox Ignited Causing A Fire Which Was Contained Inside of The Glovebox, December 2004
69 Kaiser-Hill Comprehensive Corrective Action Plan, January 2004
70 EM-RFO--KHLL-D&DOPS-2004-0003, Declaration of Operational Emergency Alert-Star: Fire Department Response to Report of Smoke From B991, December 2004
71 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 16 Walk-down of job site prior to initiation of work
72 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 17 Review standard work packages prior to start of work
74 Site Safety Continuous Improvement Plan, Revision 1, February 13, 2002
75 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 15 Separation of Private Vehicles and Commercial Traffic
76 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 24 Site Directives
77 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 22 Mutual Aid Agreements
78 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 23 Fire Services
79 Rocky Flats Closure Project Weekly Toolbox, May 17, 2004
80 Consolidation and Interim Storage of Special Nuclear Material at the Rocky Flats Environmental Technology Site Environmental Assessment and Finding of No Significant Impact (DOE/EA-1060)
81 Disposition of Surplus Highly Enriched Uranium Final Environmental Impact Statement (DOE/EIS-0240)
82 Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic Environmental Impact Statement (DOE/EIS-0229)
83 Surplus Plutonium Disposition Environmental Impact Statement (SPD EIS) (DOE/EIS-0283)
84 Final Environmental Impact Statement on Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site (DOE/EIS-0277F)
85 Variance Request RFPE-DOE-5633.3B-VR-062, Safeguard Termination Authorization for All Attractiveness Level D Waste Derived from Plutonium Bearing Residues; RFPO transmittal letter AME:SPD:SB:03002, dated 8/20/1998
86 DOE-STD-3013-2004, Stabilization, Packaging, and Storage of Plutonium-Bearing Materials, April 2004
87 Defense Nuclear Facility Safety Board Recommendation 94-1, May 1994
88 William L. Stockho to Distribution, Plutonium Stabilization and Packaging (PuSPS) Project Lessons Learned, August 2003, WLS -003-02
89 Final Close-out Report for Building 123 Decommissioning Project as Required by RFCA, September 1998
90 Technical Basis Document for the Characterization of Surface Contaminated Objects, March 2001
91 771 Closure Project Decommissioning Operations Plan, Modification 5, August 2003
92 Facilities Disposition Program Manual, Revision 3, MAN-76-FDPM, October, 2001
94 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 21 Shipping of Large Waste Items
95 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 10 Use of “Pilot Project” status to streamline property disposal
96 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 29 Disposition of equipment, after its useful life, for a closure site
97 Rocky Flats Citizen's Advisory Board Weekly Fax 10/28/96 - 11/1/96, November 1996
99 Preparation of Justifications for Continued Operation (PRO-528-NSP-450), Version 1, October 2004
100 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 18 Shipment of Waste
101 Branch Technical Position on Concentration Averaging and Encapsulation, January 1995
102 ENVIRONMENTAL RESTORATION PROGRAM OPERATIONS PLAN (ERDC-2002-0001), Revision 1, May 2002
103 Environmental Restoration Program Health and Safety Plan for the Rocky Flats Environmental Technology Site (PRO-1468-HASP-01), September 2001
105 Final RFCA Attachment 5, Rocky Flats Environmental Technology Site Action Levels and Standards Framework for Surface Water, Ground Water, and Soils, May 2003
106 Kaiser Hill Rocky Flats Environmental Restoration Program Project Management Plan, August 2000
107 RFCA Attachment 5, Rocky Flats Environmental Technology Site Action Levels and Standards Framework for Surface Water, Ground Water, and Soils, July 1996
109 Strategy For Land Configuration Design Basis Project, January 2001
110 Industrial Area and Buffer Zone Sampling and Analysis Plan, Modification 1, May 2004

110a – Chapters 1 – 5 (Introduction, Site Description, Data Quality Objectives, Sampling Strategy, Data Analysis Procedures)

110b – Chapters 6 – 10 and Appendices A & B (Data Management, Project Organization, Quality Assurance and Quality Control, Health and Safety, Schedule, References, and Appendices: A; SAP Modifications, B: Example Addendum: IHSS Group 700-4)

110c – Appendix C "Existing Data Compilation" Part 1 (IHSS Group 000-1 thru 600-6)

110d – Appendix C "Existing Data Compilation" Part 2 (All remaining IHSS Groups, References)

110e – Appendices D – J (Accelerated Action Ecological Screening Evaluation, Potential Contaminants of Concern, Contaminants of Concern, Method Detection Limits, and Reporting Limits, Acronyms, Quality Assurance Project Plan, Elevated Measurement Comparison, 903 Pad Linear Regression Case Study, Example Data Aggregation Problem)

110f – Appendix K (Response to Comments)

110g – Appendix L - (Modification 2 - Response to Comments, Maps)

111 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 08 Site Management after Remediation
112 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 25 Safeguards and Security at a Closure Site
113 Demonstration Summary Sheet-New Alpha Detection Instrumentation Developed for Characterizing SCO Waste, October 2002
114 Demonstration Summary Sheet-New Decontamination and Measurement Process for Gloveboxes Minimizes TRU Waste, March 2002
115 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 19 Correct shipping containers
116 Demonstration Summary Sheet-Polyurethane foam developed to block and brace waste container contents, June 2003
117 Demonstration Summary Sheet-Structural foam/encapsulant for leaded gloveboxes cuts worker risk and project cost, June 2003
118 Demonstration Summary Sheet-Aviation ground support equipment adapted for nuclear waste load-out at Rocky Flats, November 2003
119 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 20 Waste Handling
120 Demonstration Summary Sheet-Transporting low-level radioactive waste from Rocky Flats using railcars, October 2004
121 Demonstration Summary Sheet-Polyurea Coating Becomes Shipping Container for Radioactive Waste, September 2002
122 Demonstration Summary Sheet-Mobile WIPP-Certified Standard Waste Box Counter, February 2001
123 Demonstration Summary Sheet-Waste Tracker system improves TRU waste management at Rocky Flats, November 2003
124 Demonstration Summary Sheet-Gas Generation Testing Technology, February 2001
125 Demonstration Summary Sheet-Coated tarp material used as transportation package for non-compliant cargo containers, November 2002
126 Demonstration Summary Sheet-Chemical decontamination of gloveboxes and tanks improves safety, reduces TRU waste, no date provided
127 Demonstration Summary Sheet-Raschig Ring Vacuum System, no date provided
128 Demonstration Summary Sheet-Vac &Ship system removes gravel from B776 suspected buried equipment sites, June 2003
129 Demonstration Summary Sheet-Plasma-arc Cutting Technology, February 2001
130 Demonstration Summary Sheet-Passive Aerosol Generator reduces worker risk during decontamination activities, July 2003
131 Demonstration Summary Sheet-Ultra-high Pressure Water Jet Used to Remotely Cut B774 Tank, October 2002
132 Technology @ Rocky Flats, Chipless Duct Cutter Used To Remove Zone 1 Duct, June 2006
133 Technology @ Rocky Flats, Explosive Cutting, June 2006
134 Technology @ Rocky Flats, Building Interior Powered Hydraulic Equipment, June 2006
135 Demonstration Summary Sheet-New Treatment Rids RFETS of Largest Low-Level Mixed Waste Stream, June 2003
136 Demonstration Summary Sheet-New pumping and centrifuge systems successfully remove tank sludge, July 2003
137 Demonstration Summary Sheet-Hydrolasing Technology for the Cleanup of Radiologically Contaminated Surfaces, September 2002
138 Demonstration Summary Sheet-Contamination Survey Rate Logger System increases accuracy of contamination surveys, July 2003
139 Demonstration Summary Sheet-OST Support Resolves B771 Stack Characterization, March 2002
140 Demonstration Summary Sheet-Radio frequency alarms support “cold & dark” deactivation at Rocky Flats, July 2003
141 Technology @ Rocky Flats, Explosive Demolition, June 2006
142 Technology @ Rocky Flats, Temporary Structures for Remediation of High-Contamination Areas, June 2006
143 Demonstration Summary Sheet-Ground Water Contamination REMEDIATION AND STEWARDSHIP, February 2001
144 Demonstration Summary Sheet-Information management to support Remedial Action Program, August 2003
145 Demonstration Summary Sheet-Horizontal Directional Drilling (HDD) and Environmental Measurement while Drilling (EMWD), no date provided
146 Technology @ Rocky Flats, Pipe Overpack Containers, June 2006
147 DOE/WIPP-02-3122, CONTACT-HANDLED TRANSURANIC WASTE ACCEPTANCE CRITERIA FOR THE WASTE ISOLATION PILOT PLANT, Revision 4.0, December 2005
148 NRC Docket 71-9218; TRUPACT-II Safety Analysis Report, Rev. 21, May 2005
149 WIPP HAZARDOUS WASTE FACILITY PERMIT NM4890139088 -TSDF
150 Wirth-Lamm Task Force on Rocky Flats, October 1975
152 Long-Range Rocky Flats Utilization Study (ALO-1983), February 1983
153 Blue Ribbon Citizen's Committee Final Report on the Department of Energy Long-Range Utilization Study, December 1983
154 Final Report Colorado Environment 2000 Governor's Citizen Advisory Committee, June 1990
155 Rocky Flats National Wildlife Refuge Act, December 2001 (Pub. L. No. 107-107 && 3171-3182, 115 Stat. 1012, 1379-1388)
156 From Swords to Plowshares, A Plan for the Reuse of the Industrial Area of the Rocky Flats Environmental Technology Site, September 1998

156a – The Report

156b – Appendices A-D and Other I (Summary of Public Engagement Process, List of Informational Interviews, Local Government Briefings, FSUWG Participants), and (Public Engagement Reports, Local Government Actions/Resolutions, RF Citizens Advisory Board Activities, Citizen's Comments, Citizen's Comments on the RF Reuse Web Site, Newspapers and Magazines)

156c – Appendices Other II (RFLII Market Overview, RF Environmental Conditions, Industrial Area Infrastructure Evaluation)

156d – Appendices Other III (Facility Assessment for the Industrial Area Reuse Study)

157 Natural Heritage Resources of the Rocky Flats Environmental Technology Site and Their Conservation, Phase II: The Buffer Zone, Final Report, Final Rev., February 1996
158 Natural Resources Management Policy Rev. 0, September 1998
159 A Review of the Environmental Management Program, Presented to the Assistance Secretary For Environmental Management by the Top-to-Bottom Review Team, February 2002
160 Press Release, Department of Energy Announces a New Office of Legacy Management, February 2003
161 Statement of Michael W. Owen, Director Worker and Community Transition, Department of Energy, Before The Subcommittee on Strategic Forces, Committee on Armed Forces, United States Senate, April 2003
162 Site Transition Plan for the Rocky Flats Environmental Technology Site, March 2005
163 Environmental Statement Land Acquisition Rocky Flats Plant Colorado (WASH-1518), April 1972
164 Letter, Karen Imbierowicz to Spencer Abraham and Gale Norton, January 7, 2005
165 Federal Register, Vol. 70, No. 54, Pg. 14452-14457
167 Public Law 109-163, NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2006, Section 3112, January 2006
169 Rocky Flats Baseline Performance Review Report, June 2005, Appendix A, LL - 28 Transitioning regulatory documentation/td>
172 Jessie M. Roberson memorandum (OOM:JMR:00092) to Direct Reports, RFPO, Revocation of Delegations of Authority, September 6, 1996
173 Rocky Flats Field Office Site Closure Handbook, Revision 1, February 1998
174 Preliminary Assessment Rocky Flats Field Office Federal Workforce Transition and Site Closure, November 2002
175 Rocky Flats Field Office Function and Position Analysis, July 2003
176 Assessment of Rocky Flats Field Office Calendar Year 2003 Reduction in Force (Assessment No. RFPO-04-0024), August 2004
177 Contract between American Federation of Government Employees, AFL-CIO Local 1103 and the U. S. Department of Energy Rocky Flats Field Office, Signed December 2, 1998
178 MARS 2001 Multiple Appraiser Rating System A Guidebook to RFFO's Performance Appraisal System (Revision 5), April 2001
179 Contract, American Federation of Government Employees and the U. S. Department of Energy, Rocky Flats Field Office, December, 1998
180 Eugene C. Schmitt ltr. (03-DOE-00540) to To Whom It May Concern, May 13, 2003 and other associated documents
183 FINAL REPORT Technical Project Summary Radionuclide Soil Action Level Oversight Panel, February 2000
184 Risk Communication, Fugitive Values, and the Problem of Tradeoffs at Rocky Flats, A REPORT prepared by Theresa Satterfield and Josh Levin, Decision Research for the U. S. Department of Energy Low Dose Radiation Research Program, December 2002
185 Nuclear Cleanup of Rocky Flats DOE Can Use Lessons Learned to Improve Oversight of Other Sites' Cleanup Activities (GAO-060352), June 2006
186 Moore, LeRoy, ROCKY FLATS The bait-and-switch cleanup, Bulletin of the Atomic Scientists, January/February 2005
187 Hand-in-Hand: Stewardship and Cleanup Report from the Rocky Flats Stewardship Working Group to The Rocky Flats Coalition of Local Governments and The Rocky Flats Citizens Advisory Board, March 2001
188 Rocky Flats Long-Term Stewardship Strategy, Final Draft, June 2003
189 AN AERIAL RADIOLOGICAL SURVEY OF THE AREA SURROUNDING AND ENCOMPASSING THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE (DOE/NV/11718--1153), December 2005
190 INDEPENDENT VERIFICATION OF SOILS AT THE 903 PAD INNER AND OUTER LIP AREAS ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE, GOLDEN, COLORADO
191 Max H. Dodson, Gary Baughman, and Frazer Lockhart ltr. to Distribution, Re: Removal of the 13 Areas of Elevated Surface Soil at the 903 Lip Area, September 27, 2005
193 Service Level Agreement Between The Environmental Management Consolidated Business Center (EMCBC) and The Rocky Flats Project Office (RFPO), April 2005
194 An Analysis of the Potential for Redirection of the Rocky Flats Environmental Restoration Program (Preliminary Draft for Discussion Purposes Only), February, 1994
195 Kaiser Hill Company LLC (Kaiser-Hill) Post-Closure Access to Records Databases and Applications, June 2006
196 Facility Decommissioning Cost Model Summary of Model and Supporting Documentation, Revision 3, April 2000
197 Demonstration Summary Sheet-Harmonic Delamination: "Sonic Shakedown" makes Smart Work out of Risky Work, no date provided
198 Measurement Plan for Holdup Characterization of Building 771, Revision 1 (4-81 232-97-PLAN-HOLDUP-00 1), April 1998
199 Rocky Flats Site History, events leading to the creation of the weapons complex and events at the Rocky Flats Site from the 1930s to present, February 2002
200 Rocky Flats Environmental Technology Site Property Management Manual (1-MAN-009-PMM), REVISION 1, September 1999
201 ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE PROPERTY CONTROL MANUAL (MAN-141-PCM), VERSION 0, December 2004
202 Draft Risk Based End State Vision Document for the Rocky Flats Environmental Technology Site, no date provided
203 Eugene C. Schmitt memorandum (OOM:BJ:03-00919) to Rocky Flats Field Office Employees Grades 15 and below, Information Notice of Reduction-In-Force, July 30, 2003
204 EM-RFO--KHLL-NONPUOPS1-2002-0003, Building 865 Rigging Incident October 2002
205 EM-RFO--KHLL-NONPUOPS1-2002-0004, Active Fire Suppression Line Cut During Equipment Dismantlement, November2002
206 EM-RFO--KHLL-NONPUOPS1-2002-0005, Improper Respiratory Protection in Beryllium Area, December 2002
207 EM-RFO--KHLL-NONPUOPS1-2002-0006, Personal Injury While Size Reducing Metal, January 2003
208 EM-RFO--KHLL-NONPUOPS1-2002-0007, Load Slipped Out of Rigging During Lift, December 2002
209 Rocky Flats Environmental Technology Site Proposed Plan, July 2006
210 Attachment A, Omnibus Agreement Regarding Accelerated Closure Contract Issues (Omnibus Paper), Revision 5, March 2005.

210a – The Omnibus Transmittal Letter

210b – The Omnibus Agreement ("Attachment A" in the name of the document reflects the original intent to make the Agreement an addendum to the Closure Contract. The action to do so was never formalized.)

210c – A-1 Inspection and Acceptance of Draft Remedial Investigation / Feasibility Study and Draft Comprehensive Risk Assessment

210d – A-2 Industrial Area Culvert Disposition, May 26,2004 (over-sized map)

210e – A-3 Buffer Zone Culvert Disposition, December 7,2004 (over-sized map)

210f – A-4 Schematic for Current Flow and Water Transfer Network at the Rocky Flats Environmental Technology Site, 1/22/03

210g – A-5 Categorical Exclusion (CX) Determination - WO/CX03-03, Joseph R. Rau memo (01632), Categorical Exclusion (CXO3-03) Breaching of C-1 Dam and Removal of Concrete Spillway, December 4,2003